STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHYStellenbosch, Western Cape · Est. 2025
Building the Western Cape, properly.
Raubex Building Cape is a new Stellenbosch-based building contractor formed from Raubex Building. A local team making local decisions — with the systems, safety culture and scale of the JSE-listed Raubex Group behind it.
Stellenbosch · 6 projects
- Terra, Newinbosch
On site · Sept 2025 – Jun 2027
- The Bosk, Newinbosch
On site · Apr 2024 – Sept 2026
- Stellenbosch: hotel and conference centre refurbishment
On site · Started Jun 2026
- Newinbosch Neighbourhood Estate
On site · Started Aug 2022
- Stellenbosch, Neighbourhood Retail Centre
Completed · Mar 2025 – May 2026
- The Ilex, Newinbosch
Completed · Nov 2024 – Mar 2026
Durbanville · 1 project
- Student Accommodation Durbanville
Pre-construction
Cape Town · 1 project
- Cape Town — heritage precinct restoration
On site · Started Apr 2025
Cape Metro & Winelands
WGS84 · Locations town-level
- Building now
- Planned · pre-construction
- Completed
- Head office · The Bosk, Newinbosch
- Roads © OpenStreetMap contributors
Where we're building
- 5
- On site
- 1
- In pre-construction
- 2
- Completed
- 3
- Western Cape towns
Incl. work delivered under Raubex Building
Sites in Stellenbosch, Durbanville and Cape Town — each published here at town level as clients sign off the detail.
The project register
STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHYThe lineage
- 1974
- Raubex established
- 2007
- Raubex Group lists on the JSE
- 2015
- Raubex Building established
- 2025
- Raubex Building Cape formed
What we build
Six sectors. One way of working.
STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHY01Commercial & retail
Offices, retail centres and mixed-use precincts built to trade on opening day.
STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHY02Residential & mixed-use
Estates, apartment blocks and student accommodation — single phases to multi-year programmes.
STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHY03Industrial & logistics
Warehousing, distribution and light-industrial facilities on tight programmes.
STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHY04Education & healthcare
Schools, campuses, clinics and hospitals — built safely around people who can't stop using the site.
STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHY05Hospitality & leisure
Hotels, wine-estate facilities and leisure venues where finish quality is the product.
STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHY06Refurbishment & fit-out
Upgrades, extensions and tenant fit-outs in live buildings — phased, sequenced and tidy.
Group scale, local footing
A new name.
Not a new team.
Raubex Building Cape brings together the people, systems and supply chain that have delivered Raubex Building's Western Cape work — under a company that is run from here.
- 01
Local
Decisions are made in Stellenbosch by the people running your site — not routed through a head office two provinces away.
- 02
Backed
Raubex Building's systems, procurement network and plant, with the governance of a group listed on the JSE since 2007.
- 03
Proven
A team that has delivered residential, commercial and institutional projects in the Western Cape under the Raubex Building name.
How we deliver
From tender to the day we hand over the keys.
Site wireframe · Decorative
- 01
Tender & pre-construction
We price what we'll build. Buildability reviews, an honest programme and a procurement plan before the first pour.
- 02
Mobilise
Site establishment, the safety file, subcontractor onboarding and a baseline programme everyone has signed.
- 03
Build
Weekly programme and cost reporting. Hold-point inspections per trade. Problems raised early, not at practical completion.
- 04
Hand over & stand behind it
A short snag list, complete close-out documentation, and a defects period during which we still answer the phone.
What we hold ourselves to
Safety, quality, and straight numbers.
Safety is planned, not policed.
Every site starts with a risk assessment, a safety file and a method statement in line with the Construction Regulations — before anyone breaks ground.
Quality has hold points.
Inspection and test plans per trade. Nothing gets covered up before it has been checked and signed off.
Cost and programme, reported weekly.
You see the same numbers we do — progress against programme, cost against budget, and what changed.
Local first.
Western Cape subcontractors and suppliers wherever the work allows, with skills development on every project.
Environmental management on every site.
Dust, storm-water, noise and waste are managed to plan, not to complaints.
If a promise on this page is not being kept on your site, call us. That is what the local footing is for.
Track record
What is on the go, and what came before.
2 sites on the go, 1 in pre-construction.
Sites in Stellenbosch, Durbanville and Cape Town — each published here at town level as clients sign off the detail.
The project registerThe Bosk, Newinbosch
Stellenbosch · Residential & mixed-use · Apr 2024 – Sept 2026
The first of five planned apartment buildings at Newinbosch, 136 units from studios to penthouses over a ground floor of seven retail and two office units that now serve as the neighbourhood hub. Sold out within six months of launch.
- 136 apartments
- 7 retail + 2 office units
- Rooftop garden venue
STOCK PLACEHOLDER — REPLACE WITH RBC SITE PHOTOGRAPHYHave a site in the Western Cape?
Tell us what you are planning — a tender, a development in feasibility, or a building that needs work. We will walk the site with you and give a straight answer on cost, programme and approach.
Discuss a project